New Solar Array

Renewable Energy

Client:

Ohio Air National Guard

Location:

Toledo, OH

Project:

New Solar Array

Construction Type(s):

Federal / Military, Renewable Energy

Projected Project Completion:

07/06/12

Project Description:

This design-build project is currently under design and is projected to be completed in the summer of 2012. This project includes a maximum peak electrical production Canopy, Photovoltaic (PV) array electrical power production plant, replacing the existing roof system with a membrane EPDM (white) roof and installing a Photovoltaic Solar Roofing System using solar laminate technology and battery storage backup for canopy lighting. As part of this project, Sherrick will provide the government with an investigative research study to monitor energy savings.